The stripping of the bermuda sod on the 9th hole is going very well, we will be sodding about 80% of this fairway on Thursday. Malibu CC was in need of some sod for their tees and fairways, so they rented a truck and trailer and made two trips today. That makes it easier for us, as thats about 5000 square feet we won't have to haul away. Again if there is anyone you know that would like some sod please call my office and we can arrange a time for you to pick some up.
The sod we put down on #1 and #3 last Thursday has already rooted two inches into the existing soil and is getting better every day.
This is what #9 looked like stripped of bermuda ready for the kikuyu sod. As you can see on this fairway it is the most extensive amount of sod needed with about 90% prepared.
No comments:
Post a Comment